Hot Products
Huaiyuan County New Town Waterworks
The water intake head project of Huaiyuan New Town Waterworks passed the main body acceptance in October 2011. The water delivery pipeline project from the water intake head to the factory area was started in December 2011. The main body of the complex building, dosing room and chlorination room in the factory area passed the main body acceptance in November 2011. The main body of the clear water tank, filter tank, sedimentation tank and water delivery pump room was completed. The quality of each main body structure met the specification requirements.
Wuhu Huayan Water Co., Ltd. was established on September 13, 2005. It is jointly invested by Hong Kong and China Gas and Wuhu Construction Investment. It is a joint venture with the construction and operation of urban water supply infrastructure projects as its main business. It has successively invested in the construction of Jiankang Road Waterworks demolition and restoration project, Nanling water supply project, Yangjiamen waterworks phase II project, Sanshan temporary waterworks project, Limin Road waterworks phase II project, Changjiang South Road pipe network project and Sanshan waterworks phase I project. At present, Wuhu Huayan Water has four water plants, and the water supply capacity will reach 770000 tons/day by the end of 2014.
Dongxihu Water Supply Company is a state-owned water supply enterprise in Dongxihu District. It was founded in 1978 and has 535 employees, 67 middle and senior managers, and 61 middle and senior professional and technical personnel. The company has three water supply plants and four water supply pressurization stations, with a daily water supply capacity of 320000 tons and a daily pressure conversion capacity of 120000 tons. Among them, the daily water supply capacity of Yu's Dun Waterworks is 170000 tons, Zoumaling Waterworks is 100000 tons, and West Lake Waterworks is 50000 tons. Haikou Pressure Station has a daily pressure transfer capacity of 60000 tons, Jiangjun Road Pressure Station of 25000 tons, Baiquan Pressure Station of 25000 tons and Zhangchanghu Pressure Station of 10000 tons. The water supply area covers 495 square kilometers, and there are nearly 3000 enterprises and institutions in the water supply service area, benefiting 130000 urban and rural residents and a population of 475000.
Shahe Shuangji Cement Co., Ltd.
Shahe Shuangji Cement Co., Ltd. was founded in Shahe City, Hebei Province on July 1, 2009. It is located in the Building Materials Industrial Park of Shiliting Town. It is adjacent to Xingfeng Road in the west and Weisan Road in the north. The transportation is very convenient. The company has a daily output of 5000 tons of new dry kiln decomposition with the international advanced level of cement clinker production line. It is a large private enterprise integrating cement and clinker production and sales, and low-temperature waste heat power generation projects. It was listed as a key project in Hebei Province in 2010.
Qinghai Jinhe Cement Co., Ltd.
Qinghai Gonghe Jinhe Cement Co., Ltd. has a daily output of 2500 tons of clinker. The new dry-process decomposition cement production line outside the cellar has a supporting installed capacity of 4.5MW pure low-temperature waste heat power generation. The total investment of the project is 0.28 billion yuan. Construction started in September 2009. Up to now, 0.25 billion yuan has been invested, including 75 million yuan for civil engineering, 0.16 billion yuan for production equipment and 15 million yuan for installation projects. After the project is fully put into operation, the annual output value will be 0.3 billion yuan and the annual tax creation will be 0.1 billion yuan.
Fengqing Xiqian Cement Co., Ltd.
Fengqing Xiqian Cement Co., Ltd. is located on the bank of Guanshan River in Xiqian Village, Mengyou Town, Fengqing County, Lincang City, Yunnan Province. The company was founded in November 1972. In 2012, Yunnan Kungang Cement Building Materials Group Co., Ltd. was introduced to participate in the project construction. The main production and operation of cement clinker and cement products manufacturing, sales, sales of building materials, cement with limestone mining. The 4000-ton new dry process cement clinker production line technological transformation project plans to invest more than 0.8 billion yuan to build a new dry process cement production line with a daily output of 4000 tons of clinker, an annual output of 2 million tons of cement, and a supporting construction of a 7.5mw installed capacity low-temperature waste heat power generation system. After the completion of the project, the average annual output value is expected to reach 0.7 billion yuan, which marks a new major breakthrough in the construction of major projects in Fengqing County, industrial construction and economic development.
Changsha Fusi Water Pump Industry Co., Ltd.
Address: No.9, Yuhua Road, Yuhua District, Changsha City
Mailbox:cssbgs@163.com
Telephone:0731-85555304/85350061
Focus on us

mobile website
Copyright©2022 Changsha Fusi Water Pump Industry Co., Ltd. | Business License | Urban Substation