Inner Mongolia Huadian Wuda Thermal Power Co., Ltd.
Inner Mongolia Huadian Wuda Thermal Power Co., Ltd. is controlled by China Huadian Group Corporation and jointly funded by Beijing Sunshine Energy Investment Co., Ltd. and Dongfang Steam Turbine Factory. It is a power point project of China Huadian Corporation in Inner Mongolia, with a total planned installed capacity of 2.7 million kilowatts. The first phase of the 2 × 150000 kilowatt thermal power unit was put into operation in June 2005, and the construction of 4 × 600000 kilowatt units will continue. The preliminary work of the second phase of the 2 × 600000 kilowatt unit is in progress.
Inner Mongolia Huadian Wuda Thermal Power Co., Ltd. is controlled by China Huadian Group Corporation and jointly funded by Beijing Sunshine Energy Investment Co., Ltd. and Dongfang Steam Turbine Factory. It is a power point project of China Huadian Corporation in Inner Mongolia, with a total planned installed capacity of 2.7 million kilowatts. The first phase of the 2 × 150000 kilowatt thermal power unit was put into operation in June 2005, and the construction of 4 × 600000 kilowatt units will continue. The preliminary work of the second phase of the 2 × 600000 kilowatt unit is in progress.
The two sets of 350RS75 and 10SA-6A matched by our company are applied to the Wuda shantytown heat source factory, which can achieve a heating area of 1.2 million m2 in 2013. In 2015, our company will carry out capacity-increasing transformation on the original pump foundation to achieve a heating area of about 2 million m2.

Key words:
Changsha Fusi Water Pump Industry Co., Ltd.
Address: No.9, Yuhua Road, Yuhua District, Changsha City
Mailbox:cssbgs@163.com
Telephone:0731-85555304/85350061
Focus on us

mobile website
Copyright©2022 Changsha Fusi Water Pump Industry Co., Ltd. | Business License | Urban Substation